Revitalisation of railway tracks
Revitalisation of railway tracks

The contract calls for the total replacement of the surface of the tracks, drainage to regulatory standards, the replacement of connections, the reconstruction of level crossings, the installation of engineering structures (culverts, bridges, steel bridge, steel viaduct), the construction of platforms, traffic control and adjustment of the catenary (about 16.5 km, power, telecommunications, sanitation works).

Completion of the works is scheduled for September 2019.